Iberdrola Renovables to build La Venta III wind farm in Mexico
Published: 11-Mar-2009
By: Staff Writer Staff Writer Staff Writer
Expected to meet the energy needs of around 200,000 people
Iberdrola Renovables has secured a contract from the Mexican Federal Electricity Commission (CFE) for the construction of the La Venta III wind farm in Mexico.
Under the terms of the contract, Iberdrola Renovables will supply energy to the CFE, the state-owned company which generates, transmits, distributes and sells electricity to 80 million Mexican customers, for the next 20 years.
The La Venta III wind farm, situated in the municipality of Santo Domingo Ingenio in the Oaxaca state, will have an installed capacity of 102.85MW. Construction will start in 2009 and the facility is slated to come on stream in November 2010.
The farm will use 121 G52 wind turbines sourced from Gamesa Eolica, each measuring 44m in height and with an output of 850kw. It is expected to meet the energy needs of around 200,000 people, avoiding the emission of 160,000 tonnes of CO2 annually.
In January the company inaugurated the 80 MW La Ventosa facility, the second wind farm built in Mexico and the first developed entirely with private capital. The start-up of the La Venta III wind farm will contribute to the economic development of the state of Oaxaca. It is the first in a series of CFE initiatives to install 500 MW of wind capacity in the state over the coming years.
Network Sites

Suppliers To This Sector
Browse A-Z
GE Energy
Wind Turbines ...
Royal Academy of Engineering
Britain's National Academy for Engineering ...
ATI Stellram
High-Performance Metal Cutting Tools ...
BS Rotor Technic
Rotor Blade Repair and Service for Wind Turbines ...
C5
Energy Industry Events ...
Energy Institute
Chartered Professional Membership Body for Energy Industries ...
White Papers
Browse A-Z
2.5MW Wind Turbine
The latest evolution of GE Energy’s wind turbine technology, the 2.5xl wind turbine, is pl ...
Legal, Regulatory and Commercial Strategies for Nuclear Decommissioning and Waste Management
Overcoming the challenges associated with the clean-up of the UK's nuclear legacy. ...
Dry Hydrated Lime Injection for Coal-Fired Boiler Flue Gas Desulphurisation
Nol-Tec Systems is a leading global, service-oriented industrial automation and bulk mater ...
Design and Licensing of the UKAEA IP 2m Box
Designed as a type A package to the IAEA Regulations for the Safe Transport of Radioactive ...
IP-2 Package Containing Plutonium Contaminated Slag Pots
Designed as a type A package to the IAEA Regulations for the Safe Transport of Radioactive ...


Delicious
Digg
Reddit
Stumble
LinkedIn
Mail sent successfully